Engineering certainty for critical environments.

Precision HVAC, electrical and environmental control systems for laboratories, pharmaceutical manufacturing and GMP-compliant facilities.

Precision in design. Performance in operation. Success in delivery.

Precision in design.Performance in operation.Success in delivery.

For facility owners, project managers and validation leads delivering controlled environments in Queensland.
WHAT WE CONTROL

When the environment is the product, every parameter is a specification.

Six things a critical facility has to hold, every hour it runs.

20.0 °C

Temperature control

Setpoints held to the tolerance your process or product licence demands.

45 % RH

Humidity control

Dehumidification and humidification sized for Brisbane’s worst day, not the average.

+15 Pa

Pressure control

Room-to-room cascades that keep contamination moving in one direction.

ISO 7

Cleanroom control

Air-change rates and filtration designed to an ISO 14644-1 class.

DQ to PQ

Compliance

Design documentation structured to support your qualification protocol.

24 h trend

Monitoring

BMS and environmental monitoring that records what auditors ask to see.

INSIDE THE ENVIRONMENTS

Built for the facilities that can’t stop.

From the plant room to the production suite, every space is engineered to hold its conditions. Scroll or swipe to move through the facility.

GMP production
GMP productionCapsule filling behind a vision panel, fed by ceiling supply diffusers.
PC2 laboratory
PC2 laboratoryBiological safety cabinets with dedicated exhaust above the ceiling line.
Plant room
Plant roomAir handling units with bag filter banks and chilled water pipework.
High-care food
High-care foodHygienic stainless processing under swirl diffusers.
Bioprocess suite
Bioprocess suiteSingle-use and stainless bioreactors in a classified room.
Controlled cultivation
Controlled cultivationRows held to temperature and humidity setpoints, sensor by sensor.
HOW CLEAN AIR MOVES

Clean air flows one way: from the most critical space to the least.

Filling room, ISO 5 zone+45 PaAirlock+30 PaCorridor+15 PaUnclassified0 Pa

Illustrative values. Each step is 15 Pa.

  1. Step 1 of 4

    Filling room, highest pressure

    The ISO 5 zone sits at the top of the cascade, so any leakage path carries air out of it, never in.

  2. Step 2 of 4

    The airlock steps it down

    Interlocked doors and a lower setpoint stop the cascade collapsing when someone walks through.

  3. Step 3 of 4

    The corridor sits lower again

    Personnel and materials move against the airflow, toward cleaner space.

  4. Step 4 of 4

    Unclassified space at the bottom

    A failed fan or an open door shows up as an alarm on the BMS, not as contamination in the product.

GMP guidance sets at least 10 Pa between adjacent rooms of different grades. Your project’s values come from your risk assessment.

LIFECYCLE

One team from first concept to first batch.

A critical facility is only as good as the decisions made before the first duct is drawn. We stay with the project at every stage, so what is designed is what gets built, tested and run.

  1. Stage 1 of 5

    Concept

    We turn your process and product requirements into an engineering brief: what each room has to hold, how clean it must be, and what that means for plant, space and budget.

    • Review of your user requirement specification (URS) and process flows
    • Room data sheets: temperature, humidity, pressure, cleanliness class and containment level for every space
    • Preliminary heat loads, air-change rates and plant sizing
    • Plant room, riser and ceiling-void allowances for the architect
    • Options with order-of-magnitude costs and energy implications
    • The standards and regulatory pathway that apply (for example ISO 14644, PIC/S GMP, OGTR)
  2. Stage 2 of 5

    Design

    We design the HVAC, electrical and controls systems in detail and coordinate them in Revit, so the critical services fit the building and can be priced and built with confidence.

    • Schematic and detailed design of mechanical, electrical and controls services
    • Calculations for loads, airflows, pressure cascades and filtration
    • Revit BIM model coordinated with architecture and structure
    • CFD airflow modelling where room performance needs proving
    • Specifications, drawings and schedules for tender and construction
    • Redundancy and failure-mode strategy for critical plant
  3. Stage 3 of 5

    Validation support

    We structure the design so your quality team can show that every requirement in the URS has been met, before construction starts.

    • Design traceability from each URS requirement to a design decision
    • Input to design qualification (DQ) and design reviews
    • Input to risk assessments on the building services
    • A documentation set organised for your validation master plan
    • Controlled design change once the design is approved
  4. Stage 4 of 5

    Qualification support

    We support installation and operational qualification by setting out what to test, reviewing results and resolving defects with the contractor.

    • Commissioning requirements and test criteria in the specifications
    • Input to installation (IQ) and operational (OQ) qualification protocols
    • Witnessing and review of airflow, filter integrity, pressure, recovery and particle tests carried out by the specialist testers
    • Defect tracking and close-out with the contractor
    • As-built documentation reviewed against the design
  5. Stage 5 of 5

    Operation

    Once the facility is running, we help keep it in specification as products, processes and regulations change.

    • Performance and alarm trend reviews with your facilities team
    • Engineering input to change control for modifications
    • Support for periodic requalification
    • Energy reviews that keep specification while reducing running costs
    • Design of expansions and new suites alongside live operations
PROOF

Figures we’ll publish once they’re verified.

—

System reliability

Figure to be verified

—

Mission-critical support

Service to be confirmed

—

BIM documentation

Standard and LOD to be confirmed

—

Delivery footprint

Footprint to be confirmed

Designed to

  • ISO 14644
  • AS 1668
  • AS/NZS 2243
  • AS/NZS 2982
  • PIC/S GMP
  • OGTR PC2/PC3
CONTACT

Tell us what your facility has to hold.