
The critical environments practice of Enginova.
A dedicated team for laboratories, cleanrooms and GMP facilities, backed by Enginova’s mechanical and electrical engineers in Brisbane.
Engineers who design for qualification.
Enginova Critical brings together the HVAC, electrical and controls disciplines needed to hold a critical environment in specification. Add team members, registrations and accreditations here. [Confirm before publishing.]

One team from first concept to first batch.
A critical facility is only as good as the decisions made before the first duct is drawn. We stay with the project at every stage, so what is designed is what gets built, tested and run.
- Stage 1 of 5
Concept
We turn your process and product requirements into an engineering brief: what each room has to hold, how clean it must be, and what that means for plant, space and budget.
- Review of your user requirement specification (URS) and process flows
- Room data sheets: temperature, humidity, pressure, cleanliness class and containment level for every space
- Preliminary heat loads, air-change rates and plant sizing
- Plant room, riser and ceiling-void allowances for the architect
- Options with order-of-magnitude costs and energy implications
- The standards and regulatory pathway that apply (for example ISO 14644, PIC/S GMP, OGTR)
- Stage 2 of 5
Design
We design the HVAC, electrical and controls systems in detail and coordinate them in Revit, so the critical services fit the building and can be priced and built with confidence.
- Schematic and detailed design of mechanical, electrical and controls services
- Calculations for loads, airflows, pressure cascades and filtration
- Revit BIM model coordinated with architecture and structure
- CFD airflow modelling where room performance needs proving
- Specifications, drawings and schedules for tender and construction
- Redundancy and failure-mode strategy for critical plant
- Stage 3 of 5
Validation support
We structure the design so your quality team can show that every requirement in the URS has been met, before construction starts.
- Design traceability from each URS requirement to a design decision
- Input to design qualification (DQ) and design reviews
- Input to risk assessments on the building services
- A documentation set organised for your validation master plan
- Controlled design change once the design is approved
- Stage 4 of 5
Qualification support
We support installation and operational qualification by setting out what to test, reviewing results and resolving defects with the contractor.
- Commissioning requirements and test criteria in the specifications
- Input to installation (IQ) and operational (OQ) qualification protocols
- Witnessing and review of airflow, filter integrity, pressure, recovery and particle tests carried out by the specialist testers
- Defect tracking and close-out with the contractor
- As-built documentation reviewed against the design
- Stage 5 of 5
Operation
Once the facility is running, we help keep it in specification as products, processes and regulations change.
- Performance and alarm trend reviews with your facilities team
- Engineering input to change control for modifications
- Support for periodic requalification
- Energy reviews that keep specification while reducing running costs
- Design of expansions and new suites alongside live operations
Designed to
- ISO 14644
- AS 1668
- AS/NZS 2243
- AS/NZS 2982
- PIC/S GMP
- OGTR PC2/PC3
Tell us what your facility has to hold.
Send a brief and an engineer from Enginova Critical will get back to you.