
Pharmaceutical
Capsule encapsulation facility
GMP production suite for a pharmaceutical manufacturer.
Location to be confirmed

Building services engineered with qualification in mind from the first sketch.
Design records that can’t be traced at IQ and OQ.
Late changes that undo qualified states.
Monitoring data that won’t stand up at audit.
GMP facilities are qualified against the client’s user requirement specification under the PIC/S Guide to GMP. We structure design documents so each requirement can be traced to a design decision and a test. [Confirm before publishing.]

Send a brief and an engineer from Enginova Critical will get back to you.