
Every system that holds your environment in specification.
Designed by one team, from the air handling plant to the last pressure sensor.
Twelve services, one coordinated design.
Critical HVAC
Air systems with the redundancy and control your process can’t run without.
Laboratory ventilation
Fume cupboard exhaust and room airflow that protect the operator first.
HEPA filtration systems
Terminal filtration selected and arranged for your target class.
Humidity control
Moisture held within band through Brisbane’s wet season.
Temperature control
Setpoints held to tolerance across load and season.
Pressure control
Cascades that hold direction when doors open and filters load.
Cleanrooms
Classified spaces designed from airflow pattern to air-change rate.
Electrical services
Essential, UPS and generator-backed supplies for critical plant.
Power monitoring
Metering and power-quality data for the plant that matters.
Building management systems
Control strategy written for the critical space, not the whole building.
Commissioning
Witnessed, documented start-up against the design intent.
Validation support
Design documents structured to feed your DQ, IQ, OQ and PQ.
Air systems your process can’t run without.
- Air-handling plant with N+1 or 2N redundancy where the risk assessment calls for it
- Supply and return design to hold air-change rates and pressure cascades
- Chilled and heating water sized for process and fabric loads
- Controls sequences for duty and standby changeover designed to minimise excursions

Designed to
- ISO 14644
- AS 1668
- AS/NZS 2243
- AS/NZS 2982
- PIC/S GMP
- OGTR PC2/PC3
Tell us what your facility has to hold.
Send a brief and an engineer from Enginova Critical will get back to you.