Temperature control
Setpoints held to the tolerance your process or product licence demands.

Modelling, coordination and monitoring that let us prove a design before it is built.
Illustrative values. Each step is 15 Pa.
The ISO 5 zone sits at the top of the cascade, so any leakage path carries air out of it, never in.
Interlocked doors and a lower setpoint stop the cascade collapsing when someone walks through.
Personnel and materials move against the airflow, toward cleaner space.
A failed fan or an open door shows up as an alarm on the BMS, not as contamination in the product.
GMP guidance sets at least 10 Pa between adjacent rooms of different grades. Your project’s values come from your risk assessment.
Every duct, pipe and cable tray is modelled and clash-checked with the architecture and structure, so the critical services fit the ceiling space they were designed for. [Confirm before publishing.]

Computational fluid dynamics shows how air moves through a room, so we can test diffuser layouts, recovery times and containment before construction. [Confirm before publishing.]

The data your auditors ask for, trended and alarmed.
Setpoints held to the tolerance your process or product licence demands.
Dehumidification and humidification sized for Brisbane’s worst day, not the average.
Room-to-room cascades that keep contamination moving in one direction.
Air-change rates and filtration designed to an ISO 14644-1 class.
Design documentation structured to support your qualification protocol.
BMS and environmental monitoring that records what auditors ask to see.
Send a brief and an engineer from Enginova Critical will get back to you.