Skip to content

Free tool · Preliminary assessment

ISO Cleanroom Compliance Checker

Assess how ready your cleanroom or GMP project is against the relevant standards.

  • Readiness band
  • Risk rating
  • Key findings
  • Next steps
Start the assessment

Standards referenced: ISO 14644-1, ISO 14644-4, ISO 14698, PIC/S GMP Annex 1 and TGA GMP requirements.

  1. 01

    Describe your facility

    Facility size, type, stage, location, intended use and the target classification if known.

  2. 02

    We assess it against the standards

    Your answers are assessed against ISO 14644 and PIC/S GMP Annex 1 principles for classification, pressure, filtration and monitoring intent.

  3. 03

    Get your preliminary report

    A preliminary report with a readiness band, risk rating, your compliance checklist, key findings and next steps, ready to save as PDF.

What the report covers

  • Compliance readiness band and risk rating
  • Positive observations and potential risks
  • High-level climate commentary for your location
  • Recommended next steps and services

What it does not cover

  • Airflow, pressure, cooling or heating calculations
  • Equipment schedules, control sequences or validation protocols
  • Tender or procurement information

Start your assessment

About the facility
Compliance checklist

Tick each item that is already in place or decided. Leave unticked anything not yet considered. These questions summarise common requirements of the referenced standards and do not replace them.

Your details

I have read and understood the Privacy Collection Notice and consent to Enginova collecting and using my personal information to generate this report, respond to my enquiry, improve its services, and contact me about relevant engineering services, projects, events and industry updates. I understand I can opt out of marketing communications at any time.

Tick the consent box above to generate your report.

Questions

Is this a validation or compliance certificate?

No. It is a preliminary readiness assessment only. It is not a validation document or an engineering sign-off.

What does the readiness band mean?

It reflects how much of the information needed for the assessment was supplied. It is not a measure of compliance.

Need project-specific engineering advice?

Book a complimentary consultation with Enginova Critical. Phone 1300 748 662 or email info@enginova.com.au.

Email Enginova Critical

PRELIMINARY ENGINEERING GUIDANCE. NOT FOR CONSTRUCTION. NOT FOR TENDER. NOT FOR PROCUREMENT. NOT A DESIGN DOCUMENT. NOT A BASIS OF DESIGN. NOT A USER REQUIREMENTS SPECIFICATION.

Projects should be reviewed by suitably qualified engineering professionals prior to any design, procurement or construction activity.