Free tool · Preliminary assessment
HVAC Basis of Design Brief
Get concept-level environmental control commentary for your facility and location.
- Environmental control themes
- Climate commentary
- Readiness band
- Next steps
Referenced: AS 1668.2, NCC climate zones, AIRAH guidance and ASHRAE climatic data, and for cleanroom or GMP facilities ISO 14644-1 and PIC/S GMP Annex 1.
-
01
Describe your facility
Facility size, type, stage, location, intended use and the target classification if known.
-
02
We frame the design basis
Environmental control, ventilation and climate considerations are framed qualitatively for concept design.
-
03
Get your preliminary report
A preliminary report with a readiness band, risk rating, your compliance checklist, key findings and next steps, ready to save as PDF.
What the report covers
- Environmental control themes, including humidity and moisture intent
- High-level climate commentary for your location
- Readiness band, risk rating and next steps
What it does not cover
- Airflow, cooling or heating loads
- Design conditions, equipment selection or fan schedules
Start your assessment
Questions
Is this a basis of design?
No. A basis of design is a separate engineering deliverable prepared with Enginova Critical.
Need project-specific engineering advice?
Book a complimentary consultation with Enginova Critical. Phone 1300 748 662 or email info@enginova.com.au.
PRELIMINARY ENGINEERING GUIDANCE. NOT FOR CONSTRUCTION. NOT FOR TENDER. NOT FOR PROCUREMENT. NOT A DESIGN DOCUMENT. NOT A BASIS OF DESIGN. NOT A USER REQUIREMENTS SPECIFICATION.
Projects should be reviewed by suitably qualified engineering professionals prior to any design, procurement or construction activity.