Free tool · Preliminary assessment
User Requirements Specification Brief
Identify the requirement themes a user requirements specification for your facility will need to address.
- Requirement themes
- Open decisions
- Readiness band
- Next steps
Frameworks referenced: PIC/S GMP Annex 1, TGA GMP requirements, ISO 14644-1, ISO 14644-4 and ISO 14698.
-
01
Describe your facility
Facility size, type, stage, location, intended use and the target classification if known.
-
02
We map the requirement themes
Your answers are mapped to the requirement themes a URS for this type of facility usually covers, and the gaps are flagged.
-
03
Get your preliminary report
A preliminary report with a readiness band, risk rating, your compliance checklist, key findings and next steps, ready to save as PDF.
What the report covers
- Requirement themes for your facility
- Undefined areas to resolve before URS drafting
- Readiness band and risk rating
What it does not cover
- A full URS, requirement numbering or acceptance criteria
- Numeric limits, control logic or validation protocols
Start your assessment
Questions
Is this a user requirements specification?
No. It identifies requirement themes only. A full URS is a separate engineering deliverable.
Need project-specific engineering advice?
Book a complimentary consultation with Enginova Critical. Phone 1300 748 662 or email info@enginova.com.au.
PRELIMINARY ENGINEERING GUIDANCE. NOT FOR CONSTRUCTION. NOT FOR TENDER. NOT FOR PROCUREMENT. NOT A DESIGN DOCUMENT. NOT A BASIS OF DESIGN. NOT A USER REQUIREMENTS SPECIFICATION.
Projects should be reviewed by suitably qualified engineering professionals prior to any design, procurement or construction activity.