Howard Smith Wharves Pontoon

Brisbane City, Hospitality, 2028

Mechanical design documentation for a design and construct tender, engaged directly by Artemus Group.

The challenge

Howard Smith Wharves sits on the Brisbane River beneath the Story Bridge. The heritage-listed wharves date from the 1930s and reopened under Artemus Group as a dining and entertainment precinct in 2018. The pontoon forms part of the approved HSW 2.0 expansion, providing river access, private boat mooring and a tourism gateway to Moreton Bay. On a site sold on its outlook, any plant, ductwork or exhaust discharge that breaks the line to the river and the bridge works against the venue.

Our approach

Artemus Group engaged Enginova directly to deliver the mechanical design documentation for a design and construct tender, with Little Boat Projects as architect. We located the mechanical systems to stay out of view, keeping plant and services clear of the sightlines to the Brisbane River and the Story Bridge. Kitchen exhaust was the harder problem for a floating venue in the centre of the city. We designed the extraction around electrostatic precipitators and ozone treatment to remove contaminants from the exhaust air before discharge.

What’s next

The project is in design, with completion anticipated in 2028. Our tender documentation defines the mechanical systems the design and construct contractor will develop and build. Kyson Commercial is the builder. The pontoon is part of the next stage of Howard Smith Wharves, which Artemus Group intends to deliver ahead of the Brisbane 2032 Olympic and Paralympic Games.