La Mer
Main Beach, Gold Coast QLD, Residential, 2027
Mechanical design and construct, LOD 400 shop drawings, BIM clash coordination lead and construction-phase technical support, engaged by Air Rite Mechanical Services.
The challenge
La Mer is a 29-storey residential tower at 3580 Main Beach Parade, metres from the sand, designed by Plus Studio with one apartment per floor. When each of the 25 residences takes a whole floor of around 300 sqm, the mechanical services have to work with the architecture rather than around it. The brief was air conditioning that respects the façade and interior detailing, while giving residents individual control of each zone within their apartment.
Our approach
Engaged by Air Rite Mechanical Services, Enginova is delivering the mechanical design and construct package for La Mer, through to LOD 400 shop drawings. We lead BIM clash coordination, resolving clashes between mechanical, structure and the other services in the federated model before they reach site. The air conditioning uses VRF systems selected for the Gold Coast's harsh coastal environment, with equipment, ductwork and air terminals coordinated with the architectural detailing so the system sits within the interiors.
What's next
La Mer topped out in August 2026 and completion is expected Mid 2027. Through the construction phase, Enginova has provided technical support to Nazero Constructions and the contractors on site, making sure everyone worked from the latest, correct information. The coordinated LOD 400 shop drawings are the reference for the mechanical installation as the tower moves through fit-out towards completion.