Le Rêve
Main Beach, Gold Coast QLD, Residential, 2028
Mechanical design and construct, LOD 400 shop drawings, BIM clash coordination lead and construction-phase technical support, engaged by Air Rite Mechanical Services.
The challenge
Le Rêve sits on a 1,355 m² absolute beachfront site at 3555 Main Beach Parade, with about 30 metres of frontage and no road between the building and the sand. BGD Architects' design for ODUS is defined by a sculptural glass façade, arched forms and a double-storey curved podium. The mechanical services had to work inside that architecture, and inside half-floor and full-floor residences where every grille, louvre and plant space is on show.
Our approach
Engaged by Air Rite Mechanical Services, Enginova is delivering the mechanical design and construct package for Le Rêve, through to LOD 400 shop drawings. As on La Mer, the sister tower next door, we lead BIM clash coordination, resolving clashes between mechanical, structure and the other services in the federated model before they reach site. The air conditioning uses VRF systems selected for the Gold Coast's harsh coastal environment, with equipment, ductwork and air terminals coordinated with the façade and interior detailing.
What's next
Construction is under way, with completion anticipated in early 2028. Through the construction phase, Enginova is providing technical support to Nazero Constructions and the contractors on site, so everyone works from the latest, correct information. The coordinated LOD 400 shop drawings will be the reference for the mechanical installation. Le Rêve is our second tower on Main Beach Parade for ODUS, alongside La Mer.